Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяWas more than two weeks ago
Candidate
Male, 35 years, born on 20 December 1990
Karachi, willing to relocate (Azerbaijan, Belarus, Georgia, Other regions, Kazakhstan, Kyrgyzstan, Russia, Uzbekistan), not prepared for business trips
The approximate area of the job search is specified
Engineer (Electrical & Instrumentation )
2 000 $ in hand
Specializations:
- Other
Employment type: full time, project work
Work experience 13 years 6 months
September 2016 — currently
9 years 5 months
Cherat Cement, Nowshera Pakistan
Assistant Manager Electrical & Instrumentation
1) Coordination with our management to complete tasks on time.
2) Make schedule to meet deadlines and minimize man power.
3) Worked on erection & commissioning of new SINOMA (TCDRI) 4200 T/D cement plant.
4) Lead our team in installation of Motors, Electrical LV/MV Panels, Transformers, VFD’s & instruments, loop testing, cable laying and cable termination.
5) Now working as Shift and Maintenance Engineer.
January 2014 — September 2016
2 years 9 months
Dewan Cement, Karachi Pakistan
Karachi, www.dewancement.com
Chemical Production, Fertilizers... Show more
Sr.Electrical Engineering
Assignment:
1) Coordinate with our higher management to make well planned schedule to meet the dead lines and minimize power losses.
2) Leading our teams and giving them proper technical support regarding Cement mill, Grid station and Coal Plant.
3) Designing, Manufacturing & installation of electrical panel, Fault tracing on Electric panel, commission and trouble- shooting of PLC’s, VFD’s and work on power factor panel.
3) Pneumatic equipment installation, control and optimization.
Project:
1) Erection of vertical cement mill LOESCHE GmbH (150 Tones). Supervision of the erection and commissioning of the whole project, giving daily reports to our manager.
2) Look after and supervision of the Schneider Electric as outsource, provide them complete layout of the project, Regarding electrical drives termination, cabling and LV, MV panel installation.
June 2013 — December 2013
7 months
Sind Feed & Allied Products
Pakistan, www.sindfeedsalliedproducts.enic.pk/
Chemical Production, Fertilizers... Show more
Electrical Engineer
1) Coordinate with our General Manager and Production Manager to make well planned schedule to meet the dead Lines and Send the monthly report to our Admin manager.
2) Designing, Manufacturing & installation of electrical panel. Leading our teams and giving them proper technical support regarding winding & look after of 3 phase motor (1HP to 335HP), overload control (Current, voltage & Phase) of 3 phase motor.
3) Silos elevators control and load management.
4) Star & delta connection, soft-starter & inverter control of 3 phase motor also commissioning and troubleshooting of PLC.
5) Commissioning and troubleshooting of Van-Aarsen (C-750), SALMATEC, CPM pellet mills and mixer plant.
5) Pneumatic equipment installation, control and optimization. Boiler look after and its automation, Gas and argon welding.
December 2012 — June 2013
7 months
ZTE Pakistan
Pakistan, www.ztezhongxingtelecompakistanpvtltd.enic.pk/
Telecommunications, Communications... Show more
Site Engineer
Production: Installation Of ZTE & NEC Equipment.
System: ZTE SDR (ZXMG 8700, 8800, 8900)
Telenor Vega Project (MW & SDR swap)
Project: ZTE-Telenor swap Project
Project: NEC IPASO link Project
Assignments:
1) Look After all the installation configuration, commissioning of SDR Expansion &
Transmission expansion.
2) Give proper Technical support to our teams regarding SDR installation, testing,
commissioning and complete transmission documentation and reporting of PATs,
3) Coordinate with our internal Project Manager and External Project Manager,
Co-ordination with authorized people for preparing the Planning send the daily
report to our Project Team.
4) Carrying out Technical trainings regarding ZTE SDR equipment and also about
NEC IPASO for or teams and also for other associated subcontractors.
5) Carrying out the site surveys for the proper installation. Make well planed
schedule to meet the dead lines.
August 2011 — November 2011
4 months
NTDC (Sheikh Muhammad 500KV Grid) Peshawar Pakistan
Pakistan, www.ntdc.com.pk
Power Industry... Show more
Trainee Engineer
I have gained experience in the maintenance and troubleshooting of power transformers, CTs, PTs, Station Batteries, Battery chargers, etc as per detail given below.
a)Power transformer testing including open circuit test, short circuit test,
b)Opening and closing time of circuit breakers,
c) Complete maintenance and installation of circuit breakers.
Skills
Skill proficiency levels
About me
Internet Surfing, Hunting, Fishing, Travelling, Reading, Singing
Higher education
2016
Higher education
Hamdard University, Karachi Pakistan
ME Electrical Engineering, Electrical Engineering, Electromechanics and Electrical technologies
2012
Higher education
CECOS University, Peshawar Pakistan
BSc Electrical Engineering, Electrical Engineering, Electromechanics and Electrical technologies
Languages
Citizenship, travel time to work
Citizenship: Pakistan
Permission to work: Pakistan
Desired travel time to work: Doesn't matter
