Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Was yesterday at 23:04

Candidate

Male, 42 years, born on 7 November 1983

Nizhny Novgorod, willing to relocate (Azerbaijan, Belarus, Georgia, Other regions, Kazakhstan, Kyrgyzstan, Russia, Uzbekistan), prepared for business trips

Construction and Commissioning Electrical Expert

Specializations:
  • Other

Employment type: full time, project work/one-time assignment

Work experience 19 years 4 months

February 2025currently
1 year 2 months

Svobodny (Amurskaya oblast)

EHT Manager
Сonstruction site "Gazprom" (Amur region, Svobodnyi) Installation, testing and commissioning of electrical heating systems. - Control of the heating cable installation works on the pipelines, instruments and equipment. - Inspection and commissioning of installed heating lines, junction boxes, panels and control systems. - Carrying out pre-commissioning works. - Final commissioning and signing handover documents
March 2024December 2024
10 months
Fersol Service (ex-nVent)

China

EHT Superintendent
Сonstruction site BOMESC (China, Tianjin) "nVent" vendor representative for installation, testing and commissioning of electrical heating systems. - Control of the heating cable installation works on the pipelines, instruments and equipment. - Inspection and commissioning of installed heating lines, junction boxes, panels and control systems. - Carrying out pre-commissioning works. - Final commissioning and signing handover documents
January 2023February 2024
1 year 2 months
nVent Rus

Murmansk

EHT Superintendent
Сonstruction site ЦСКМС (Belokamenka) "nVent" vendor representative for installation, testing and commissioning of satellite heating systems. - Control of the heating cable installation works on the pipelines, instruments and equipment. - Inspection and commissioning of installed heating lines, junction boxes, panels and control systems. - Carrying out pre-commissioning works. - Final commisioning and sighning handover documents
December 2019June 2022
2 years 7 months
KT - Kinetics Technology (Maire Tecnimont)

Kstovo, www.mairetecnimont.com/en

Construction, Real Estate, Architecture... Show more

Electrical supervisor (construction/commissioning)
- Organization of electrical work - Working and following the project documentation - Checking and issuing request material forms - Daily reports on the progress of work done - Monitoring the progress and quality of work - Supervision of cable trays installation, earthing and lightning protection system, lighting system, heat tracing system, cable pulling, power transformers and switchgears installation etc - Issuing NCR, PL, OSD reports - Vendors support - Switchings and operating with MV and LV switchgears
August 2017July 2019
2 years
Maire Tecnimont Russia

Kingisepp, www.mairetecnimont.com/en

Construction, Real Estate, Architecture... Show more

Electrical supervisor (construction/commissioning)
- Organization of electrical work - Working and following the project documentation - Issuing request material forms - Daily reports on the progress of work done - Monitoring the progress and quality of work - Supervision of cable trays installation, earthing and lightning protection system, lighting system, heat tracing system, cable pulling etc - Issuing NCR, PL, OSD reports - Vendors support - Switchings and operating with MV and LV switchgears - Total pre-commissioning and commissioning works on the site (substation, switchgears)
November 2016May 2017
7 months
VolgaEngineering

Volgograd

Site Engineer
- Organization of electrical work - Formation and management of teams - Working with the project and executive documentation - Preparation of applications for materials - Daily reports on the progress of work done - Monitoring the progress and quality of work - Hand over objects and documentation to the contractor
April 2014September 2016
2 years 6 months

Volgograd, www.yamata.com.tr/en/content/volgograd-deep-conversion-project

Construction, Real Estate, Architecture... Show more

Lead Electrical Engineer
- Control over the execution of all types design; - Electrical construction, pre-commissioning and commissioning works on the site; - Supervision over subcontractors: pulling and termination of all cable types (power cables, heating cable, instrumentations cable etc;), equipment and instruments installation; - Participate in the MV and LV switchgears electrical testing and relay protection adjustment; - Consideration of technical and financial issues;
January 2010April 2014
4 years 4 months
«Promtekhenergo» ( concurrently )

Alchevsk

Lead Electrical Engineer
- Power transformers complete tests; - Adjustment of relay protection, - Insulation resistance measurement (megger test) - Grounding system tests, - L-N loop tests, - High voltage tests.
January 2009April 2014
5 years 4 months
PJSC «AMK»

Alchevsk, www.amk.lg.ua/index.php?lang=en

Metallurgy, Metalwork... Show more

Control and instrumentation engineer
Instrumentation Engineer of facility for preparation of pulverized coal fuel and further blowing in blast-furnaces. Job responsibilities: Provision of maintenance for automatic-control system equipment and software support based on Allen Bradley controllers.
April 2007January 2009
1 year 10 months
PJSC «AMK»

Alchevsk, www.amk.lg.ua/index.php?lang=en

Metallurgy, Metalwork... Show more

Control and instrumentation engineer
Blast-furnace process area, Instrumentation group Job responsibilities: Control and maintenance over process control system of iron smelting in the blast-furnace. Equipment and software support based on Allen Bradley and Siemens controllers.
February 2006April 2007
1 year 3 months
PJSC «AMK»

Alchevsk, www.amk.lg.ua/index.php?lang=en

Metallurgy, Metalwork... Show more

Electrical Supervisor
Automation and mechanization central laboratory, group of rolling mills Job responsibilities: Control over installation of electrical equipment, preparation for pre-commissioning stage and commissioning of a rolling mill 2000 within the frames of workshop reconstruction TLTs-2 ( thick sheet production line)
October 2005February 2006
5 months
PJSC «AMK»

Alchevsk, www.amk.lg.ua/index.php?lang=en

Electrician
Installation and maintenance of cable lines, lighting systems for industrial and domestic compartments, configuration of transformer and switchboard cell, panels

Skills

Skill proficiency levels
Электротехнические работы
Производство пусконаладочных работ
АСУ ТП
5 группа по электробезопасности
Английский язык
Пользователь ПК
Электрические системы и слаботочные системы
Автоматизация производства

Driving experience

Own car

Driver's license category B

About me

Responsibility, punctuality, scrupulosity, self-dependence, hardworking, ability to explore promptly a problem of any degree of complexity, discipline, promptness, ability to work equally efficiently both in a group and individually. Additional skills and interests: • PC Advanced user (Microsoft Office, AutoCAD) • Language skills– English (intermediate) • Driving license «В» (experience >10years) • Experienced in relay protection adjustment. • Electrical construction and commissioning activity supervision.

Portfolio

Higher education

2006
Higher education
Donbass State Technical University, Alchevsk
Factory automation, Electronic systems engineer

Languages

Russian — Native

English — B2 — Upper Intermediate

Citizenship, travel time to work

Citizenship: Russia

Permission to work: Russia

Desired travel time to work: Doesn't matter