Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяWas more than two weeks ago
Male, 46 years, born on 16 October 1979
Baku, willing to relocate (Azerbaijan, Belarus, Other regions, Kazakhstan, Russia, Ukraine), prepared for business trips
Project Manager
5 500 $ in hand
Specializations:
- Chief project engineer
- Strategy manager/consultant
- Project manager
- Construction project manager
Employment type: full time, part time, project work/one-time assignment
Work experience 23 years 8 months
January 2021 — currently
5 years 4 months
AGAH GROUP LLC
Baku, www.agahgroup.az
Project Director
The Director of Construction oversees the planning, coordination, and execution of building projects,
ensuring they are completed on time, within budget, and to the required quality standards. This role
involves strategic leadership and the management of resources, including personnel, finances, and
materials, to achieve the objectives of each construction project. By serving as the main point of
contact between various stakeholders, including architects, contractors, and clients, the Director of
Construction ensures that communication is maintained and project goals are aligned. Their
expertise not only guides the project through its lifecycle but also ensures compliance with legal
requirements, safety standards, and environmental regulations, fostering a smooth and efficient
construction process.
Construction directors are responsible for monitoring work on building projects. They ensure jobs
are completed on time and within budget, to the standard expected of your company. Construction
directors manage schedules of work and delegate tasks to senior colleagues and their teams, to
ensure that each phase of the build is completed as planned.
- Director of Construction Job Duties
Oversee the planning, design, and construction phases of all construction projects to ensure
they meet organizational standards and objectives.
Develop and manage the construction department’s budget, including forecasting project
costs and controlling expenses to stay within financial limits.
Negotiate contracts with architects, vendors, contractors, and other professionals, ensuring
terms are favorable and protect the organization’s interests.
Implement safety protocols and compliance measures across all construction sites to
minimize risks and adhere to federal, state, and local regulations.
Coordinate with project managers to ensure timely completion of projects, addressing any
delays or issues that arise during the construction process.
Facilitate communication between various stakeholders, including investors, local
government officials, and community groups, to maintain positive relationships and ensure
project alignment with community needs and expectations.
Lead the adoption of new construction technologies and methodologies to improve
efficiency, reduce costs, and enhance the quality of construction projects.
Conduct post-project evaluations to assess the performance of contractors, the effectiveness
of project management, and the overall satisfaction of stakeholders, using findings to inform
future projects.
- The job role of a construction director includes the following duties:
Overseeing the logistical requirements of a project
Delegating work to senior colleagues and their teams
Meeting regularly with clients, third parties and managers to report on progress
Setting targets, objectives and responsibilities for all supervised staff
Regularly review timings, budget, labour, risk and project plans to ensure work stays on track
Reporting to clients and board members on project progress
Supplying financial records
Recommending policy and procedure improvements
Monitoring performance against agreed criteria
Ensuring contractual obligations are fulfilled
Ensuring the delivery of high-quality work within contract timescales
Dealing with contract disputes and mitigating the impact of any issues
Working in an office and on a construction site.
October 2015 — December 2020
5 years 3 months
Asinshaat-N, Georgia
Georgia
Project Manager, Zugdidi Water Supply Network Sysytem Project, Georgia
Oversee and direct construction projects from conception to completion
Review the project in-depth to schedule deliverables and estimate costs
Oversee all onsite and offsite constructions to monitor compliance with building and safety regulations
Coordinate and direct construction workers and subcontractors
Select tools, materials and equipment and track inventory
Meet contractual conditions of performance
Review the work progress on daily basis
Prepare internal and external reports pertaining to job status
Plan ahead to prevent problems and resolve any emerging ones
Negotiate terms of agreements, draft contracts and obtain permits and licences
Analyse, manage and mitigate risks
Ensure quality construction standards and the use of proper construction techniques
October 2014 — October 2015
1 year 1 month
ASTEXNOSERVİS LLC
Quality Manager, Construction Manager, Construction of SOCAR Urea and Amonia Factory Project
Monitoring QC Inspection and Testing Activities, Daily Inspection of Work, Punch List Inspection, Pre-Final Inspection, Final Acceptance Inspection, Preventive Action Request, Corrective and Preventive Action Plan, Request for Information, Method Statemens, PTechnical Inspections and/or Testing, Non-Conformance and Corrective Actions.
Identifying, correcting, verifying, and documenting corrective action is controlled by the QA Program. The Project Manager and designated staff review NCRs, audit reports, and assessment reports to determine corrective action. When deficiencies are identified, the Project Manager investigates the root causes of the deficiencies and defines and implements the necessary corrective action. This includes identifying the person or persons responsible for initiating corrective action. The Halla E & C Co. Team tracks and reviews the results of corrective action to determine the effectiveness of implementation and reports the review.
• Review communication procedures
• Review of Project-specific QA plan
• Review testing/inspection schedule and
• Reporting and documentation requirements
• Discuss quality lessons learned
• Participating in Pre-Construction Meetings
• Monitoring QC Inspection and Testing Activities
• Technical Inspections and/or Testing
• Daily Inspections and Reporting
• Inspections performed and their results
• Tests performed and their results
• Material submittal review/approval
• Material received and inspected
• Equipment received and inspected
• Sampling performed, as applicable
• Rework items and corrective actions
• Method statements
• Nonconformance Report
• Preventive Action Request
• Request for Information
• Corrective and Preventive Action Plan
June 2012 — January 2014
1 year 8 months
Halla Corporation Co.
Azerbaijan
Construction, Real Estate, Architecture... Show more
Quality manager
Monitoring QC Inspection and Testing Activities, Daily Inspection of Work, Punch List Inspection, Pre-Final Inspection, Final Acceptance Inspection, Technical Inspections and/or Testing, Non-Conformance and Corrective Actions.
Identifying, correcting, verifying, and documenting corrective action is controlled by the QA Program. The Project Manager and designated staff review NCRs, audit reports, and assessment reports to determine corrective action. When deficiencies are identified, the Project Manager investigates the root causes of the deficiencies and defines and implements the necessary corrective action. This includes identifying the person or persons responsible for initiating corrective action. The Halla E & C Co. Team tracks and reviews the results of corrective action to determine the effectiveness of implementation and reports the review.
• Review communication procedures
• Review of Project-specific QA plan
• Review testing/inspection schedule and
• Reporting and documentation requirements
• Discuss quality lessons learned
• Participating in Pre-Construction Meetings
• Monitoring QC Inspection and Testing Activities
• Technical Inspections and/or Testing
• Daily Inspections and Reporting
• Inspections performed and their results
• Tests performed and their results
• Material submittal review/approval
• Material received and inspected
• Equipment received and inspected
• Sampling performed, as applicable
• Rework items and corrective actions
July 2012 — June 2013
1 year
RAMCO LLC
Azerbaijan
Construction, Real Estate, Architecture... Show more
Contract Manager, Drinking Water and Wastewater Project Shabran&Siyezen Region
The exact nature of the work will depend on the size of the employing organization.
However, it will almost certainly involve:
Meet with clients to gain a full understanding of their business and needs;
Present project proposals to client;
Put together job costing for production and installation;
Prepare works orders;
Agree any additional work to be completed within the set timescales;
Maintain communications with in-house departments and external contractors;
Gather all project information for invoicing at the end of the project;
Brief production staff and suppliers on the manufacturing requirements;
Make improvements to contract processes and procedures;
Work with other professionals including construction managers and planning engineers.
June 2010 — June 2012
2 years 1 month
Heerim Architects & Planners
Azerbaijan
Construction, Real Estate, Architecture... Show more
Quality manager
Participating in Pre-Construction Meetings, Monitoring QC Inspection and Testing Activities, Daily Inspection of Work, Punch List Inspection, Pre-Final Inspection, Final Acceptance Inspection, Technical Inspections and/or Testing, Non-Conformance and Corrective Actions.
Identifying, correcting, verifying, and documenting corrective action is controlled by the QA Program. The Project Manager and designated staff review NCRs, audit reports, and assessment reports to determine corrective action. When deficiencies are identified, the Project Manager investigates the root causes of the deficiencies and defines and implements the necessary corrective action. This includes identifying the person or persons responsible for initiating corrective action. The Heerim CM Team tracks and reviews the results of corrective action to determine the effectiveness of implementation and reports the review.
• Review communication procedures
• Review of Project-specific QA plan
• Review testing/inspection schedule and
• Reporting and documentation requirements
• Discuss quality lessons learned
• Participating in Pre-Construction Meetings
• Monitoring QC Inspection and Testing Activities
• Technical Inspections and/or Testing
• Daily Inspections and Reporting
• Inspections performed and their results
• Tests performed and their results
• Material submittal review/approval
• Material received and inspected
• Equipment received and inspected
• Sampling performed, as applicable
• Rework items and corrective actions
August 2007 — June 2010
2 years 11 months
DİA Holding FZCO
Azerbaijan
Construction, Real Estate, Architecture... Show more
Quality control engineer, Quality Control Manager
Concrete organization, order, concrete analysis, evaluations, with the reckoning of subcontractors, will enter the
Payment will be cut from the fallen concrete and concrete subcontractors and other adjustment. To determine
concrete losses, losses have to work for minimum concrete. Involved in the Quality of Concrete, Cement, Repair
materials, Mix design, inspection work and other assistance.
Provide guidance and assistance in resolving quality related problems, Work with other departments for the inspections, testing and commissioning of the Project, Develop quality assurance, quality control and measurement techniques in coordination with other departments, Provide support to all other departments for handling and evaluating Contractor complaints, taking corrective actions and reporting those to the project management, Performs internal audits as required and recommends corrective and preventive actions . Review the designer and construction contractor quality plans, Review and approve the preparation and close-out of all Non-Conformity Reports (NCRs), as well as Corrective and Preventive Action Reports.
a.Establish engineering procedure
b.Plan and manage overall field construction work.
c.Responsible for provision of manpower, construction equipment, tool, tower equipment and necessaries materials required for construction and pre-commissioning
d.Prepare construction procedures, pre-commissioning procedures and check list.
e.Execute construction work with due consideration of safety and quality
f.Manage Foreman's personal and equipment to perform the assistant work in a timely manner.
g.Review and approve quality control program and other quality related documents submitted by vendors.
h.Prepare project quality assurance program
i.Review and approve quality assurance program and other quality related documents submitted form subcontracts and vendors
j.Control to keep quality related documents after project completion of the site work.
August 2003 — July 2006
3 years
Turquoise MMC – BASF Construction Chemicals
Azerbaijan
Project Control and Marketing Manager
BASF CONSTRUCTION CHEMICALS, MAXIT GROUP (SERPO, DİTERMAN), EPO CONSTRUCTION CHEMICALS, large structures such as the chemical company sales and marketing applications of the materials was done. Concrete plants at the same time consulting, implementation, and concrete work supervisor as I did. The team installed in October from the year 2005. Any construction, especially (Interior / Exterior Work, Epoxy Coatings, Water and Thermal Insulation, Screed, Plaster, Gypsum and Gypsum Plaster, Roofing) doing. In addition to do the job and started to provide services.
May 1998 — November 2000
2 years 7 months
Azerbaijan State Oil Company
Azerbaijan
Civil Engineer
Petroleum processing and their separation from the rest of the materials to be sent to the factory, processing and other. Civil Engineering supports the exploration, production and transportation of petroleum products. Civil engineering is more than just building plants, pipelines, roads, offshore rigs or foundations. It also includes
environmental protection, geotechnical assessment, water resource management, transportation, material management and surveying.
Skills
Skill proficiency levels
Driving experience
Driver's license category B
About me
-Foreign Languages
-» Azeri [Mother tongue]
-» English [Reading: 10 Writing: 10 Speaking: 8]
-» Russian [Reading: 10 Writing: 8 Speaking: 10]
-» Turkish [Reading: 10 Writing: 10 Speaking: 10]
-» Arabic [Reading: 9 Writing: 6 Speaking: 4]
-Computer Skills Windows Systems, Microsoft Office Programs, Internet Explorer, AutoCAD 2010, Microsoft Visio, Adobe Acrobat
�
-Qualifications Level Experience
-» Construction
-ASTM Standards -Good-5
-EN Standards -Good-5
-Concrete Plants -Good-5
-Epoxy Paint Application -Good-5
-Feasibility -Good-5
-Residential Project -Good-5
-» Engineering -CAD/CAM -Good-5
-» Quality / R&D -ISO 9000 -Good-5
-ISO 9001 -Good-5
-ISO 9001:2000 -Good-5
-Smoking -I smoke
-Hobbies -Football, Table Tennis, Reading Books, Travel, Chess, Checkers,
Computer and other.
Higher education (bachelor)
2001
Higher education (bachelor)
Caucasus University Baku
Engineering Faculty, Industrial Engineer, 09.1997 - 06.2001
Languages
Citizenship, travel time to work
Citizenship: Azerbaijan
Permission to work: Azerbaijan, Georgia, Kazakhstan, Russia, Turkey, Turkmenistan, UAE, Ukraine
Desired travel time to work: Doesn't matter
